Information for Contractors & Consultants

Resources & Information

Overview

Qualification Application for Consultants, Contractors, Suppliers, and Vendors

Qualification Application Only to be completed when requested by the Procurement Department.

Golden State Water Company’s Engineering Design Center (EDC) has made the following resources available for contractors and consultants.

Standard Drawings

All Golden State Water Company projects with work orders created on or after Nov. 18, 2019 will use and reference the 2019 version of the GSWC Standard Drawings and Approved Materials List listed on this web page. Please refer to project specific instructions in PlanetBid to determine the applicability of these documents. These documents also apply to all repair construction projects initiated after Nov. 18, 2019.

Standard Drawings

  • Pipeline Construction
  • Civil and Site Work
  • Pump Stations
  • Wells
  • Water Tanks

Approved Materials List

Tribal Land Transfer Notifications

Quarterly Reports
Quarter 3 Report

Tribal Land Policy
For more information, visit the official CPUC Tribal Land Transfer Policy webpage:
CPUC Tribal Land Transfer Policy

Reference Files

New Business Narrative
New Business Application
Tract – Water Improvement Sample Plans
Water Improvement Sample Plans
Service Survey Report
National Pollutant Discharge Elimination System (NPDES)
Fire Flow Test Application FF-1
Approved Fire Hydrant Location Plan-Sample
Approved Fire Sprinkler Plan-Sample
Fire Flow Availability-Sample
Fire Flow Requirements-Sample
Application for Payment – Invoicing Instructions
2022 Supplier Diversity Annual Report & 2023 Annual Plan
ASWC Vendor Code of Conduct
Diversity and Inclusion Policy

CAD Requirements

CAD Version:  All AutoCAD files submitted to Golden State Water Company shall be in AutoCAD Civil 3D 2017 file format.  Files not submitted in this format will be rejected.

GSWC Standard Drawing Template: The GSWC Standard Drawing Template (GSWC Template) stores attributes, layers, and styles customized to our EDC. Always begin a new drawing file with the GSWC Template file.

GSWC Standard Border: The GSWC Standard Border shall be used on all projects. The border AutoCAD file shall be attached to the project drawing as a referenced drawing (Xref). All borders shall be Xref to paper space at 1:1 at 0,0,0 insertion point and shall not be scaled by a drawing factor.

Construction Notes Master List (1-15-19): The Construction Notes Master List (Master List) is provided in PDF format for reference. The Master List contains the majority of construction note callouts that are required for GSWCs pipeline projects. Standard CAD blocks of all the construction notes included in the Master List are located in the GSWC Template.

GWSC Standard Plotting (Full): The GSWC Template contains Page Setups to be used when plotting from AutoCAD. These Page Setups are associated with Plotters/Printers within the EDC Department. Full Size Page Setups are associated with the GSWC-Full.ctb Pen Settings.

GWSC Standard Plotting (Half): The GSWC Template contains Page Setups to be used when plotting from AutoCAD. These Page Setups are associated with Plotters/Printers within the EDC Department. Half Size (11×17) Page Setups are associated with the GSWC-Half.ctb Pen Settings.